Credits
Contracting authority: Kras d.d
Coordination (contracting authority): Mirjam Stanič, Kras d.d.
First publication date: 25.08.05
Contractor: Arctur d.o.o.
Coordination:Metka Špacapan
Visual concept: Dejan Šuc
Realisation: Drago Čigon,
Matej Lazar
Dynamic sistem:
Arctur ADS
Arctur GIDS
All rights (copyright and other) to the design, the HTML and the Flash code of the website presentation, as well as to the materials used for the preparation of the contents and the elaboration of the website presentation are obtained on the basis of a contract between the client and the contractor and are copyrighted in compliance with the Copyright Act (Official Gazette of the Republic of Slovenia, no. 21/1995 and 9/2001).